Aging Inspection | 1/27/2016 | 1/27/2016 | 1/27/2016 | | PASS |
Andy J. Long
|
|
|
Townhome complete; BLD finaled. Active projects on-going with temp BMPs to remain installed.
|
DOC - Permit Finaled | 1/27/2016 | 1/27/2016 | 1/27/2016 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 11/27/2015 | 11/27/2015 | 11/27/2015 | | DONE |
Chad Schwendiman
|
|
|
Work in progress
|
Site Preparation | 7/6/2015 | 7/6/2015 | 7/6/2015 | P | PASS |
Andy J. Long
|
|
|
Inspection requested via web by Erby Gonzales
New Barber Valley Townhome approved to start. DIs are protecct, lined concrete washout is on site. Active projects are in compliance with no trackout or discharges occuring. Approved.
|
Site Preparation | 6/18/2015 | 6/19/2015 | 6/19/2015 | P | PASS |
Andy J. Long
|
|
|
###-#### Inspection requested via web by Erby Gonzales
1 of 2 new Barber Valley Townhomes- excavation approved, BMPs installed.
-need to designate lined concrete washout in coordination with Brighton Corp. prior to foundation work.
|