General Inspection | 10/11/2016 | 10/11/2016 | 10/11/2016 | | PASS |
Andy J. Long
|
|
|
Home complete and occupied. Lanscaping and rear hilliside stabilized. Hillside bond issued. No further ESC conditions. DI bag on Windsong to remain due to active construction in area.
|
DOC - Permit Finaled | 10/11/2016 | 10/11/2016 | 10/11/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/26/2016 | 9/26/2016 | 9/26/2016 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 9/2/2016 | 9/9/2016 | 9/9/2016 | P | NR |
Andy J. Long
|
|
|
Landscaping still in progress. Need rain and/or irrigation to encourage growth of the hydoseeded area..
No violations, will keep permit open
|
General Inspection | 9/2/2016 | 9/2/2016 | 9/2/2016 | | PASS |
Andy J. Long
|
|
|
Home construction is complete and finishing touches are under way. Pool also complete and hillside below pool has been hydroseeded for stabilization and re-vegetation. Will check for Site Final next inspection on 9/9
|
General Inspection | 8/18/2016 | 8/18/2016 | 8/18/2016 | | PASS |
Andy J. Long
|
|
|
Landscaping in progress. Near completion. No violations occuring at site
|
General Inspection | 8/3/2016 | 8/3/2016 | 8/3/2016 | | PASS |
Andy J. Long
|
|
|
Home is near completion. Rear hillside area is stable with more vegetation in progress. Driveway is now paved. No corrections, will continue to monitor.
|
General Inspection | 7/19/2016 | 7/19/2016 | 7/19/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/4/2016 | 7/4/2016 | 7/4/2016 | | CANC |
Evan Jenkins
|
|
|
holiday
|
General Inspection | 6/17/2016 | 6/17/2016 | 6/17/2016 | A | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 6/3/2016 | 6/3/2016 | 6/3/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 5/19/2016 | 5/19/2016 | 5/19/2016 | | PASS |
Andy J. Long
|
|
|
Near completion. Landscaping crew onsite. No trackout, runoff on culdesac is not turbid- DI bag installed. Rear hilside below pool has had vegetation preserved, no erosion or sediment on road below.
|
General Inspection | 5/4/2016 | 5/4/2016 | 5/4/2016 | | PASS |
Andy J. Long
|
|
|
No sediment or other material leaving site. HIllside vegetation has been preserved. Approved.
|
General Inspection | 4/19/2016 | 4/19/2016 | 4/19/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/1/2016 | 4/1/2016 | 4/1/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/17/2016 | 3/17/2016 | 3/17/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 3/2/2016 | 3/2/2016 | 3/2/2016 | | PASS |
Andy J. Long
|
|
|
WIP. Vegetative buffer preserved around site slopes. No sediment runoff or erosion rills observed. No trackout from entrance. No windblown litter issues. Approved.
|
General Inspection | 2/16/2016 | 2/16/2016 | 2/19/2016 | | PASS |
Eric Strole
|
|
|
|
General Inspection | 1/29/2016 | 1/29/2016 | 1/29/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 12/30/2015 | 12/30/2015 | 12/30/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 12/15/2015 | 12/15/2015 | 12/15/2015 | | PASS |
Andy J. Long
|
|
|
|
Complaint Inspection | 9/22/2015 | 9/22/2015 | 9/22/2015 | P | PART |
Andy J. Long
|
|
|
No discharges or sediment runoff occuring, but some housekeeping corrections are needed.
1. Empty full trash bin to prevent wind blown trash issue 2. Sweep up apron, sidewalk and gutter in front of project 3. Pick up any litter or beverage containers around site
|
General Inspection | 8/3/2015 | 8/3/2015 | 8/4/2015 | A | FAIL |
Andy J. Long
|
|
|
NO site prep. No permits posted, no BMPs installed. Minor trackout and some dirt on sidewalk. Left VM on RP (Darren Wood) and GC (Ryan Construction)
Will check back tomorrow or wait to hear from permitees.
|