DOC - Permit Finaled | 11/21/2016 | 11/21/2016 | 11/21/2016 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 11/21/2016 | 11/21/2016 | 11/21/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/8/2016 | 11/8/2016 | 11/8/2016 | | PASS |
Andy J. Long
|
|
|
Onsite storm drains have now had the filled silt filter sacks removed to properly handle stormwater runoff. Construction materials have been cleaned, no loose dirt or materials onsite.
ESC final correction requests and conditions have been satisfied. ESC permit for Falling Brook is now closed.
|
General Inspection | 9/23/2016 | 9/23/2016 | 9/23/2016 | | PEND |
Andy J. Long
|
|
|
project complete. Spoke with developer Justin Toothman about removing DI bags from the private storm drains on 9/22. He stated he will work on gettting a crew to remove them next week. No other corrections remaining
|
Site Final | 8/8/2016 | 8/8/2016 | 8/8/2016 | P | NR |
Andy J. Long
|
|
|
WIP on interiors of condos. No violations. Need to remove DI bags at entrance to get Final. BLD still open.
|
General Inspection | 7/19/2016 | 7/19/2016 | 7/20/2016 | | PASS |
Andy J. Long
|
|
|
Project near completion. Finishing site work and have some interior curbing remaining. Landscaping is near completion. Supervisor for Perriman Construction (site mgmt sub-contractors) Mateo stated he has been monitoring sweep up and trackout. No trackout to Walling. Waste materials contained. No corrections issued.
|
Random Inspection | 6/3/2016 | 6/3/2016 | 6/3/2016 | P | PASS |
Andy J. Long
|
|
|
NO trackout or discharges. Project approaching completion. No corrections
|
Random Inspection | 5/12/2016 | 5/12/2016 | 5/12/2016 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 5/6/2016 | 5/6/2016 | 5/6/2016 | | PASS |
Andy J. Long
|
|
|
WIP on interior. Condo frames and exterior are complete. No trackkout from site, storm drains that capture runoff have sediment filter bags installed. Trash contained. ESC permit signs posted on job trailer.
|
General Inspection | 3/21/2016 | 3/21/2016 | 3/21/2016 | | PASS |
Andy J. Long
|
|
|
WIP. Condos near completion. No trackout or discharges leaving site.
|
General Inspection | 2/1/2016 | 2/1/2016 | 2/1/2016 | | PASS |
Andy J. Long
|
|
|
WIP. No trackout. No spills or other prohibited discharges observed. Permit sings posted on job trailer.
|
General Inspection | 12/16/2015 | 12/16/2015 | 12/16/2015 | | PASS |
Andy J. Long
|
|
|
WIP on condos. Site utilities and parking lot/stormwater drainage were existing. Vertical construction in progress. No muddy runoff or issues at site. No corrections. 4 seperate permits for the 4 buildings.
|