DOC - Permit Finaled | 8/8/2016 | 8/8/2016 | 8/8/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/8/2016 | 8/8/2016 | 8/8/2016 | | PASS |
Andy J. Long
|
|
|
Falling Brook Condos is near completion. Exteriors and site landscaping/paving is complete. No further inspections on this permit, see ESC15-00688 for Final Inspection and DI bag removal at entrance on Walling.
|
General Inspection | 6/21/2016 | 6/21/2016 | 6/21/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/6/2016 | 5/6/2016 | 5/6/2016 | | PASS |
Andy J. Long
|
|
|
WIP on interior. Condo frames and exterior are complete. No trackkout from site, storm drains that capture runoff have sediment filter bags installed. Trash contained. ESC permit signs posted on job trailer.
|
General Inspection | 3/21/2016 | 3/21/2016 | 3/21/2016 | | PASS |
Andy J. Long
|
|
|
WIP. Condos near completion. No trackout or discharges leaving site.
|
General Inspection | 2/1/2016 | 2/1/2016 | 2/1/2016 | | PASS |
Andy J. Long
|
|
|
WIP. No trackout. No spills or other prohibited discharges observed. Permit sings posted on job trailer.
|
General Inspection | 12/16/2015 | 12/16/2015 | 12/16/2015 | | PASS |
Andy J. Long
|
|
|
WIP on condos. Site utilities and parking lot/stormwater drainage were existing. Vertical construction in progress. No muddy runoff or issues at site. No corrections. 4 seperate permits for the 4 buildings.
|