Site Final | 12/31/2015 | 1/5/2016 | 1/6/2016 | P | PASS |
Andy J. Long
|
|
|
WIP. Site contained by structural/decorative wall for patio and ADA ramp structure. Crews sweeping areas around activity to control dirt.
No muddy runoff observed, no trackout or other violations.
|
General Inspection | 12/31/2015 | 12/31/2015 | 12/31/2015 | | PEND |
Andy J. Long
|
|
|
Construction complete but need to remove temporary DI bags, in particular on 4th and Idaho Street. Will inform RP and check back next week for site final. No materials or disturbed area remaining at site.
|
Random Inspection | 11/19/2015 | 11/19/2015 | 11/19/2015 | P | PASS |
Andy J. Long
|
|
|
Project near completion. Some interior work and exterior painting is ongoing and some materials on site. No corrections, need to check for DI bag installed in the MS4s around the project.
|
Site Preparation | 9/24/2015 | 9/24/2015 | 9/24/2015 | P | PASS |
Andy J. Long
|
|
|
Note - not a site prep, general inspection:
WIP on new parking area and site improvements. No trackout or sediment runoff occuring at site through course of project. DIs have inlet protection. Approved
|
Conference | 8/21/2015 | 8/21/2015 | 8/24/2015 | P | CANC |
Andy J. Long
|
|
|
Gunner-call to meet Phone #: ###-####
data entry error
|
Random Inspection | 8/20/2015 | 8/20/2015 | 8/20/2015 | P | PASS |
Andy J. Long
|
|
|
WIP. Permit posted. BMPs installed. No fugitive dust, trackout or discharges. No correcttions needed.
|
Site Preparation | 7/29/2015 | 7/31/2015 | 7/31/2015 | P | PASS |
Andy J. Long
|
|
|
Mike Phone #: ###-####
Permit sign posted on Bannock Street entrance.. Perimeter BMPs and inlet protection are staged. Approved to start parking lot and exterior renovation. Will begin work tomorrow.
|
Site Preparation | 7/29/2015 | 7/31/2015 | 7/31/2015 | A | CANC |
Evan Jenkins
|
|
|
10 AM site prep requested
Double Inspection: Talked with RP via phone to perform Site prep in the afternoon
|