Site Final | 4/13/2016 | 4/13/2016 | 4/13/2016 | P | PASS |
Andy J. Long
|
|
|
Home complete and occupied. Front yard now stabilized with bark chip and raised planters. No temp BMP removal remaining. ESC permit closed.
|
Aging Inspection | 2/23/2016 | 2/23/2016 | 2/23/2016 | | PEND |
Evan Jenkins
|
|
|
perm re-veg
|
General Inspection | 12/21/2015 | 12/21/2015 | 12/21/2015 | P | PASS |
Andy J. Long
|
|
|
Loose dirt and mud on sidewalk and gutter have been cleaned up as requested. No construction activity at site. Need to haul off excess dirt when conditions approved. Clean up was successful at prevent prohibited muddy disharge to storm drain. Approved.
|
Tracking Control | 12/15/2015 | 12/22/2015 | 12/21/2015 | A | FAIL |
Andy J. Long
|
|
|
reinspection
Loose mud and sediment tracked out from house to Thatcher and on sidewalk.
Verbal CN to RP Steve Hanson to clean up ASAP to prevent further muddy runoff going to storm drain.
|
Site Preparation | 12/15/2015 | 12/15/2015 | 12/15/2015 | P | CANC |
Bill VanDegrift
|
|
|
|
Random Inspection | 12/15/2015 | 12/15/2015 | 12/15/2015 | P | FAIL |
Bill VanDegrift
|
|
|
clean street and sidewalk called rp
|
Site Preparation | 7/30/2015 | 7/30/2015 | 7/30/2015 | P | PASS |
Andy J. Long
|
|
|
Silt fence installed to protect neighboring homes. Small lot with old house demolished. Work was approved to start, keeping clean at time of inspection. Permit sign posted. Approved.
|
Site Preparation | 7/30/2015 | 7/30/2015 | 7/30/2015 | A | CANC |
Andy J. Long
|
|
|
rescheduled for afternoon. Verbal confirmation to start given to excavator RP Luke to start this AM
|