Site Final | 12/23/2015 | 12/23/2015 | 12/23/2015 | P | PASS |
Andy J. Long
|
|
|
Work complete. No temp BMP inlet filters on Broadway MS4. No outstanding corrections or stabilization required. Tenants already occuping space.
Permit finaled.
|
Random Inspection | 8/25/2015 | 8/25/2015 | 8/25/2015 | P | PASS |
Andy J. Long
|
|
|
WIP on demo and remodel of One-Eleven Broadway. No trackout or discharges from work. Permit sign is clearly posted. No fugitive construction dust observed. Approved.
|
Site Preparation | 8/12/2015 | 8/12/2015 | 8/12/2015 | P | PASS |
Andy J. Long
|
|
|
Chris Phone #: ###-####
Private storm drains have DI bag installed. Main construction entrance will be at south exit which will remain paved. Northern portion of site will have asphalt removed.
Trackout controls will be brooming dirt tires before exit and ordering street sweeper as needed.
Permit sign posted. Approved.
|