Site Final | 4/17/2017 | 4/17/2017 | 4/17/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
General Inspection | 4/17/2017 | 4/17/2017 | 4/17/2017 | | PASS |
Melissa Jannusch
|
|
|
Over 70% of soil is stable. House is complete. Okay to final.
|
General Inspection | 3/31/2017 | 3/31/2017 | 3/31/2017 | | PASS |
Melissa Jannusch
|
|
|
Vegetation continuing to grow on hillside. No ESC issues observed.
|
General Inspection | 3/16/2017 | 3/16/2017 | 3/16/2017 | | PASS |
Melissa Jannusch
|
|
|
No ESC issues observed. Landscaping almost complete. Some grasses starting on backhill. Project okay.
|
General Inspection | 3/1/2017 | 3/1/2017 | 3/1/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/14/2017 | 2/14/2017 | 2/15/2017 | | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 1/30/2017 | 1/30/2017 | 2/1/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/13/2017 | 1/13/2017 | 1/13/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/29/2016 | 12/29/2016 | 12/29/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/14/2016 | 12/14/2016 | 12/14/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/29/2016 | 11/29/2016 | 11/29/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/14/2016 | 11/14/2016 | 11/14/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/28/2016 | 10/28/2016 | 10/28/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/28/2016 | 9/28/2016 | 9/28/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/13/2016 | 9/13/2016 | 9/13/2016 | | PEND |
Andy J. Long
|
|
|
Still needs landscaping and stabilization, BLD is open. No sediment or other materials leaving site to storm water system.
|
General Inspection | 8/29/2016 | 8/29/2016 | 8/29/2016 | | PEND |
Evan Jenkins
|
|
|
SFH complete Disturbed areas need re-vegetated
|
General Inspection | 8/12/2016 | 8/12/2016 | 8/12/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 7/28/2016 | 7/28/2016 | 7/28/2016 | | PEND |
Evan Jenkins
|
|
|
pending full re-veg establishment
|
General Inspection | 7/13/2016 | 7/13/2016 | 7/13/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 6/28/2016 | 6/28/2016 | 6/28/2016 | | PEND |
Evan Jenkins
|
|
|
re-veg. sfh complete
|
General Inspection | 6/13/2016 | 6/13/2016 | 6/13/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 5/27/2016 | 5/27/2016 | 5/27/2016 | | CANC |
Andy J. Long
|
|
|
no earthwork at this time based on prior inspections. BLD open, no inspection conducted. Will inspect in 2 weeks.
|
General Inspection | 5/12/2016 | 5/12/2016 | 5/12/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/27/2016 | 4/27/2016 | 4/27/2016 | | PASS |
Evan Jenkins
|
|
|
no issues observed
|
General Inspection | 4/12/2016 | 4/12/2016 | 4/12/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/28/2016 | 3/28/2016 | 3/28/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 3/11/2016 | 3/11/2016 | 3/16/2016 | | PASS |
Andy J. Long
|
|
|
WIP on interior. No violations observed.
|
General Inspection | 2/19/2016 | 2/19/2016 | 2/19/2016 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 2/4/2016 | 2/4/2016 | 2/4/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 1/5/2016 | 1/6/2016 | 1/7/2016 | A | PASS |
Andy J. Long
|
|
|
WIP on frame. Some minor trackout but no discharges. No corrections at this time.
|
General Inspection | 1/4/2016 | 1/4/2016 | 1/5/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
Site Preparation | 8/6/2015 | 8/6/2015 | 8/6/2015 | P | PASS |
Evan Jenkins
|
|
|
Please call ahead before you head out - Aaron Phone #: ###-####
Permit Posted Perimeter Wirebacked Silt fence installed along both sides and bottom of construction site. Outpak washout located onsite as well. Approved for Construction
|