DOC - Permit Finaled | 4/1/2016 | 4/1/2016 | 4/1/2016 | P | PASS |
Andy J. Long
|
|
|
Project complete. Warehouse now in use with access drive paved. Adajacent parcel to be developed by owner, no sediment leaving site. All permits finaled.
|
General Inspection | 2/23/2016 | 2/23/2016 | 2/23/2016 | | CANC |
Evan Jenkins
|
|
|
|
General Inspection | 1/8/2016 | 1/8/2016 | 1/8/2016 | | PASS |
Andy J. Long
|
|
|
|
Random Inspection | 10/8/2015 | 10/8/2015 | 10/8/2015 | P | PASS |
Andy J. Long
|
|
|
WIP. 2 project on Targhee by JSE Enterprises. No trackout, permit signs posted. Work sites are clean. No corrections needed.
|
Site Preparation | 8/18/2015 | 8/19/2015 | 8/19/2015 | A | PASS |
Andy J. Long
|
|
|
Jeff Phone #: ###-####
RP-GC on site meeting. Project will occur behind active project ESC15-00344 (same builder). Construction entrance installed, permit sign is posted. Small sweeper unit available for any trackout.
Lot is reclaimed land and fill and was formerly a gravel pit. The surfcace drainage ponds in the middle of the lot and infiltrates at a high rate.
Lined concrete washout pit to be installed between buildings. Aprroved for construction.
|