Site Final | 10/23/2015 | 10/23/2015 | 10/23/2015 | P | PASS |
Andy J. Long
|
|
|
Rough grading phase of project complete. Site has permit posted, no trackout, discharges, or other issues. Vertical construction now in progress and covered under ESC15-00812
|
General Inspection | 8/27/2015 | 8/27/2015 | 8/27/2015 | P | PASS |
Andy J. Long
|
|
|
NO activity at site. Site has has perimter wattles trenched in as requested. Permit sign is posted, no sediment or other materials leaving site. Home site has been excavated but no foundation work yet. Approved.
|
Site Preparation | 7/23/2015 | 7/24/2015 | 7/24/2015 | A | PASS |
Andy J. Long
|
|
|
9 am site prep
Stockpile along frontage will be hauled out early next week, therefore no wattle installed at this time.
Rear slope is protected with properly installed wattle. Permit sign posted.
Met RP on site to discuss scheduling and phasing of BMPs. Approved.
|
Site Preparation | 7/22/2015 | 7/23/2015 | 7/23/2015 | P | CANC |
Andy J. Long
|
|
|
rescheduled
|
Site Preparation | 7/22/2015 | 7/22/2015 | 7/22/2015 | P | CANC |
Andy J. Long
|
|
|
BMPs and permit to be posted tomorrow. Will inspect at that time.
|