Site Final | 2/27/2017 | 2/27/2017 | 2/27/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
General Inspection | 2/27/2017 | 2/27/2017 | 2/27/2017 | | PASS |
Melissa Jannusch
|
|
|
okay to final
|
General Inspection | 2/10/2017 | 2/10/2017 | 2/10/2017 | P | PASS |
Melissa Jannusch
|
|
|
Building is finished. Backyard slope is stabilized with grass only. Wattles are still in place above back yard retaining wall.
|
General Inspection | 1/31/2017 | 1/31/2017 | 2/3/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/16/2017 | 1/16/2017 | 1/17/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/30/2016 | 12/30/2016 | 12/30/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/15/2016 | 12/15/2016 | 12/19/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/30/2016 | 11/30/2016 | 12/1/2016 | | CANC |
Andy J. Long
|
|
|
revegetation phase. BLD finaled. No inspection conducted
|
General Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 | | PEND |
Andy J. Long
|
|
|
revegetation...no changes since prior inspeciton
|
General Inspection | 10/31/2016 | 10/31/2016 | 10/31/2016 | | PASS |
Andy J. Long
|
|
|
BLD now finaled and landscaping installed. Rear hillside vegtation not yet established. No sediment runoff or issues on Orion. Will keep open for monitoring hillside.
|
General Inspection | 10/14/2016 | 10/14/2016 | 10/14/2016 | | PASS |
Andy J. Long
|
|
|
Home is now occupied. Rear hillside slope was hydroseed and the flat areas laid with sod. Landscape crew in process of cleaning. RP/project coordinator to call for Site Final.
|
General Inspection | 9/29/2016 | 9/29/2016 | 9/29/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/14/2016 | 9/14/2016 | 9/14/2016 | | PEND |
Andy J. Long
|
|
|
No significant changes at site. Still need to remove perimeter silt fence.
|
General Inspection | 8/30/2016 | 8/30/2016 | 8/30/2016 | | PASS |
Evan Jenkins
|
|
|
|
Random Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 | P | PART |
Andy J. Long
|
|
|
Checked backyard slope for sediment and erosion controls.
The hillside has been properly horizontally tracked. One section of the bottom of the slope is a 3 ft rock retaining wall. On top of the wall and areas on the sides have a sediment control wattle staked in. Some dirt has started to accumulate on top of the wattle. No hydroseed, hydrolmulch or tacifier has been applied.
Need to provide stabilization of slope and fix areas of wattle that have had sand cross over it. Check progress next inspection... landscaping and stabilization is schedule to start soon
|
General Inspection | 8/8/2016 | 8/8/2016 | 8/8/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/22/2016 | 7/22/2016 | 7/22/2016 | | PASS |
Evan Jenkins
|
|
|
Wip. some minor landscaping has begun, but not yet at the 80% hillside requirement. No discharges leaving the site at time of inspection.
|
General Inspection | 7/7/2016 | 7/7/2016 | 7/7/2016 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 6/22/2016 | 6/22/2016 | 6/22/2016 | | PASS |
Evan Jenkins
|
|
|
no activity occuring at this time no discharges leaving site nor dust
|
General Inspection | 6/7/2016 | 6/7/2016 | 6/7/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/23/2016 | 5/23/2016 | 5/23/2016 | | PASS |
Evan Jenkins
|
|
|
Slow WIP: internal work occuring only. No ESC issues observed at this time
|
General Inspection | 5/5/2016 | 5/5/2016 | 5/5/2016 | | PASS |
Evan Jenkins
|
|
|
WIP: no esc issues observed at this time
|
General Inspection | 4/20/2016 | 4/20/2016 | 4/20/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 4/4/2016 | 4/4/2016 | 4/4/2016 | | PASS |
Andy J. Long
|
|
|
Clean site, no trackout, no loose dirt or sand on sandwalks and gutter.
Rear hillside has been tracked and has perimeter fiber wattle installed.
|
General Inspection | 3/16/2016 | 3/16/2016 | 3/16/2016 | | PASS |
Evan Jenkins
|
|
|
wip: no issues observed at this time
|
General Inspection | 2/18/2016 | 2/18/2016 | 2/19/2016 | | PART |
Bill VanDegrift
|
|
|
bmp's in place no trackout
|
Random Inspection | 1/28/2016 | 1/28/2016 | 1/28/2016 | A | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 1/8/2016 | 1/8/2016 | 1/8/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 12/23/2015 | 12/23/2015 | 12/23/2015 | P | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 11/20/2015 | 11/20/2015 | 11/20/2015 | A | PASS |
Andy J. Long
|
|
|
WIP. Permit sign posted, stabilized entrance/loading area installed, and perimeter straw wattles are staked in and containing sediment. Rear hillside has been tracked horizontally to prevent erosion rills. Soil is very sand and infiltrates well.
No violations, no corrections.
|
General Inspection | 10/28/2015 | 10/28/2015 | 10/28/2015 | P | PASS |
Andy J. Long
|
|
|
WIP. Perimeter BMPs installed and slope has been tracked. Very sandy site with good infiltration and little runoff. No violations observed.
|
General Inspection | 10/13/2015 | 10/13/2015 | 10/13/2015 | P | PASS |
Andy J. Long
|
|
|
WIP. BMP installed. Site housekeeping (sweeping & trash containment) has been good throughout project. No corrections needed at this time.
|
Site Preparation | 8/25/2015 | 8/26/2015 | 8/26/2015 | A | PASS |
Andy J. Long
|
|
|
Rod Phone #: ###-####
Meeting with RP and excavator onsite. Perimeter BMPs (straw wattles) are installed. Requested that downslope wattles be trenched into the ground by the end of the week. A orange construction fence has been installed at the bottom clearing limits to preserve perimter vegetation. Rock retaining wall already installed by homeowner and RPC.
Lined cement washtut and construction entrance installed next to ESC permit sign.
Approved to start excavation, will check for wattle trenching next inspection.
|