Permit Information
Permit NumberESC15-00862
StatusFinaled
Name TODD MARTIN
Site Address 525 E ORION CT
Project NameSonnenberg Residence
Customer Number 
ePlanReviewNo
Description
Site preparation (stockpile removal), retaining wall installation by RPC, and new SFH construction. Initial SWPPP submitted under ESC15-00345 and approved. Hillside erosion BMPs, perimeter controls, and tracking controls will be needed during different phases.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final2/27/20172/27/20172/27/2017PPASS
DetailsMelissa Jannusch
General Inspection2/27/20172/27/20172/27/2017 PASS
DetailsMelissa Jannusch
okay to final
General Inspection2/10/20172/10/20172/10/2017PPASS
DetailsMelissa Jannusch
Building is finished. Backyard slope is stabilized with grass only. Wattles are still in place above back yard retaining wall.
General Inspection1/31/20171/31/20172/3/2017 CANC
DetailsAndy J. Long
General Inspection1/16/20171/16/20171/17/2017 CANC
DetailsAndy J. Long
General Inspection12/30/201612/30/201612/30/2016 CANC
DetailsAndy J. Long
General Inspection12/15/201612/15/201612/19/2016 PASS
DetailsAndy J. Long
General Inspection11/30/201611/30/201612/1/2016 CANC
DetailsAndy J. Long
revegetation phase. BLD finaled. No inspection conducted
General Inspection11/15/201611/15/201611/15/2016 PEND
DetailsAndy J. Long
revegetation...no changes since prior inspeciton
General Inspection10/31/201610/31/201610/31/2016 PASS
DetailsAndy J. Long
BLD now finaled and landscaping installed. Rear hillside vegtation not yet established. No sediment runoff or issues on Orion. Will keep open for monitoring hillside.
General Inspection10/14/201610/14/201610/14/2016 PASS
DetailsAndy J. Long
Home is now occupied. Rear hillside slope was hydroseed and the flat areas laid with sod. Landscape crew in process of cleaning. RP/project coordinator to call for Site Final.
General Inspection9/29/20169/29/20169/29/2016 CANC
DetailsAndy J. Long
General Inspection9/14/20169/14/20169/14/2016 PEND
DetailsAndy J. Long
No significant changes at site. Still need to remove perimeter silt fence.
General Inspection8/30/20168/30/20168/30/2016 PASS
DetailsEvan Jenkins
Random Inspection8/15/20168/15/20168/15/2016PPART
DetailsAndy J. Long
Checked backyard slope for sediment and erosion controls.

The hillside has been properly horizontally tracked. One section of the bottom of the slope is a 3 ft rock retaining wall. On top of the wall and areas on the sides have a sediment control wattle staked in. Some dirt has started to accumulate on top of the wattle. No hydroseed, hydrolmulch or tacifier has been applied.

Need to provide stabilization of slope and fix areas of wattle that have had sand cross over it.
Check progress next inspection... landscaping and stabilization is schedule to start soon
General Inspection8/8/20168/8/20168/8/2016 PASS
DetailsAndy J. Long
General Inspection7/22/20167/22/20167/22/2016 PASS
DetailsEvan Jenkins
Wip. some minor landscaping has begun, but not yet at the 80% hillside requirement. No discharges leaving the site at time of inspection.
General Inspection7/7/20167/7/20167/7/2016 PASS
DetailsDaryl Spivey
General Inspection6/22/20166/22/20166/22/2016 PASS
DetailsEvan Jenkins
no activity occuring at this time
no discharges leaving site nor dust
General Inspection6/7/20166/7/20166/7/2016 PASS
DetailsAndy J. Long
General Inspection5/23/20165/23/20165/23/2016 PASS
DetailsEvan Jenkins
Slow WIP: internal work occuring only. No ESC issues observed at this time
General Inspection5/5/20165/5/20165/5/2016 PASS
DetailsEvan Jenkins
WIP: no esc issues observed at this time
General Inspection4/20/20164/20/20164/20/2016 PASS
DetailsEvan Jenkins
General Inspection4/4/20164/4/20164/4/2016 PASS
DetailsAndy J. Long
Clean site, no trackout, no loose dirt or sand on sandwalks and gutter.

Rear hillside has been tracked and has perimeter fiber wattle installed.
General Inspection3/16/20163/16/20163/16/2016 PASS
DetailsEvan Jenkins
wip: no issues observed at this time
General Inspection2/18/20162/18/20162/19/2016 PART
DetailsBill VanDegrift
bmp's in place no trackout
Random Inspection1/28/20161/28/20161/28/2016APASS
DetailsDaryl Spivey
General Inspection1/8/20161/8/20161/8/2016 PASS
DetailsEvan Jenkins
General Inspection12/23/201512/23/201512/23/2015PPASS
DetailsDaryl Spivey
General Inspection11/20/201511/20/201511/20/2015APASS
DetailsAndy J. Long
WIP. Permit sign posted, stabilized entrance/loading area installed, and perimeter straw wattles are staked in and containing sediment. Rear hillside has been tracked horizontally to prevent erosion rills. Soil is very sand and infiltrates well.

No violations, no corrections.
General Inspection10/28/201510/28/201510/28/2015PPASS
DetailsAndy J. Long
WIP. Perimeter BMPs installed and slope has been tracked. Very sandy site with good infiltration and little runoff. No violations observed.
General Inspection10/13/201510/13/201510/13/2015PPASS
DetailsAndy J. Long
WIP. BMP installed. Site housekeeping (sweeping & trash containment) has been good throughout project. No corrections needed at this time.
Site Preparation8/25/20158/26/20158/26/2015APASS
DetailsAndy J. Long
Rod Phone #: ###-####

Meeting with RP and excavator onsite. Perimeter BMPs (straw wattles) are installed. Requested that downslope wattles be trenched into the ground by the end of the week. A orange construction fence has been installed at the bottom clearing limits to preserve perimter vegetation. Rock retaining wall already installed by homeowner and RPC.

Lined cement washtut and construction entrance installed next to ESC permit sign.

Approved to start excavation, will check for wattle trenching next inspection.