Site Final | 1/6/2016 | 1/6/2016 | 1/6/2016 | P | PASS |
Andy J. Long
|
|
|
Home complete, landscaped, and stabilized. Temp BMPs for Trailwinds sub to remain for ongoing construction. Subdivsion BMPs implemented. No violations.
|
Random Inspection | 11/27/2015 | 11/27/2015 | 11/27/2015 | A | PASS |
Chad Schwendiman
|
|
|
|
Site Preparation | 7/30/2015 | 7/31/2015 | 7/31/2015 | A | FAIL |
Evan Jenkins
|
|
|
Call prior // Cameron Phone #: ###-####
Excavation for foundation already begun prior to Site Prep Inspection Approval. Permit posted
|