Information based on query as of Wednesday, June 19, 2024.
Permit Information
Permit NumberESC15-00916
StatusFinaled
Name TYSON BIRD
Site Address 1267 N CLOVERDALE RD
Project NameWhite Cloud Subdivision
Customer Number 
ePlanReviewNo
Description
Installation of underground utilities, asphalt paved roads, sidewalks, curb and gutter for new 16 acre residential sub . EPA SWPPP prepared for CGP tracking # IDR12A057. Project scheduled for July to Dec. 2015. Silt fence perimeter, new DI filter protection (once installed), and construction entrance off Mount Hood Ave. Site slopes to the west, no surfaces waters. SITE PREPARATION inspection required, call 384-3802 to schedule.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final8/23/20168/23/20168/23/2016PPASS
DetailsAndy J. Long
Subdivision development work is complete. SFHs now in progress by Hayden Homes and have seperate ESC permits. Also, phase 2 is now is now in progress and covered under ESC16-01108
General Inspection7/25/20167/25/20167/25/2016 PASS
DetailsEvan Jenkins
work is in progress. no dust issues or discharges at this time of inspsection
General Inspection6/17/20166/22/20166/22/2016APASS
DetailsEvan Jenkins
Subdivision is in compliance at this time.
Work occuring on multiple SFH's
No ESC issues observed
General Inspection6/17/20166/17/20166/17/2016 CANC
DetailsAndy J. Long
rescheduled
General Inspection5/17/20165/17/20165/17/2016 PASS
DetailsAndy J. Long
WIP on SFHs by Hayden HOmes. RP Tom Lane. DIs have sediment protection, designated washout provided, and permit signs posted.
General Inspection4/14/20164/14/20164/15/2016PPASS
DetailsAndy J. Long
Landscaping road & sidewalk medians currently. Open lots have volunteer plants growing well and stabilizing dirt. No windblown dust, no trackout. No sfh construction yet. No corrections at this time.
Random Inspection3/16/20163/16/20163/16/2016PPASS
DetailsAlan Hauser
containment holding all water run off in rain storm
General Inspection2/24/20162/24/20162/24/2016 PASS
DetailsEvan Jenkins
Aging Inspection1/1/20161/1/20161/4/2016 CANC
DetailsAndy J. Long
General Inspection10/5/201510/5/201510/5/2015PFAIL
DetailsAndy J. Long
Some minor trackout to Cloverdale observed.

No permit sign posted, no SWPPP information posted, and no site prep or contact with ESC division has been conducted by contractor.

Corrections:
- increase sweeping until Mt. Hood St. is paved
- post City of Boise yellow ESC permit sign with contact information
- post SWPPP information per CGP requirements

Called Nampa Paving to issue correction.