Site grading & drainage; (PAYETTE BREWING CO) Permit to remove all existing asphalt, flatwork and plant material on site to prepare for new asphalt parking lot. Work to include new landscaping, flatwork, permeable pavers, & storm water drainage improvements
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled5/25/20165/25/20165/25/2016PPASS
DetailsAndy J. Long
General Inspection5/25/20165/25/20165/25/2016 PASS
DetailsAndy J. Long
Project construction complete. Materials removed. Murale painting crew finalizing exterior. DI bags removed, parking lot now to cleaned by property management stormwater O&M. ESC conditions satisfied.
General Inspection5/10/20165/10/20165/10/2016 PART
DetailsEvan Jenkins
Perform BMP maintenance
General Inspection4/21/20164/21/20164/21/2016 PASS
DetailsAndy J. Long
Near completion. Work on exterior finish and interior. No earth work occuring, no fugitive dust, trackout, or discharges. Temp BMP sediment bags still installed till final site deactivation/clean up.
General Inspection3/30/20163/30/20163/30/2016 PASS
DetailsEvan Jenkins
WIP: No violations oberved. Site is currently clean
General Inspection2/24/20162/24/20162/24/2016 PASS
DetailsAndy J. Long
WIP on interior. Parking lot issues were resolved last week. Oil spill was absorbed with floor dry, leaky tractor was removed from site, and the parking lot was swept as requested. DI bags have been emptied and maintained. No new corrections, WIP.
General Inspection2/3/20162/5/20162/5/2016AFAIL
DetailsAndy J. Long
follow up inspection from verbal CN issued 2/3

No clean up of oil spill by RP. No installation of a drip pan to capture the leakage. No maintenance on BMPs (DI bags, staging lot sweep up) conducted. If Monday still unaddressed I will issue BMP violation with Special Investigation Fee....
General Inspection2/3/20162/3/20162/3/2016PPART
DetailsAndy J. Long
Verbal correction notice to RP Kevin:

1. Clean up spill under backhoe in parking lot being used as staging area. Use floor dry to absorb and sweep up. RP stated he will have the owner of the backhoe move it offsite.

2. Sweep parking lot and perform maintenance on DI bags installed (parking lot, Pioneer, and River)

No trackout offsite or other violations observed. Will check back on Friday
General Inspection12/18/201512/18/201512/18/2015PPASS
DetailsAndy J. Long
WIP. No prohibited discharges or trackout observed. See also ESC15-00985 for coverage on Payette Brewing Co. project.