Site Final | 11/16/2015 | 11/16/2015 | 11/16/2015 | A | PASS |
Andy J. Long
|
|
|
Home construction on exterior complete and yard has been stabilized. ESC permit conditions satisifed.
|
Site Preparation | 8/26/2015 | 8/26/2015 | 8/26/2015 | P | PART |
Andy J. Long
|
|
|
Phone #: 9144370 >> Inspection requested via mobile web by Bryan Millar
Permit sign posted and Dropzone projects are in fairly good condition. No trash, trackout, or sediment runoff issues. Approved to excavate foundation.
Corrections for Dropzone: 1. Install DI bags for future construction on the two inlets and Abrams and Freewater. 2. Clean up old concrete washout. Pick up miscellaneous concrete chunks left on open parcel. 3. Provide new designated concrete washout area(s)
|