Aging Inspection | 2/26/2016 | 2/26/2016 | 2/26/2016 | | DONE |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 2/26/2016 | 2/26/2016 | 2/26/2016 | P | PASS |
Evan Jenkins
|
|
|
SFH Complete ESC Conditions Satisfied
|
Random Inspection | 11/25/2015 | 11/25/2015 | 11/25/2015 | P | PASS |
Eric Strole
|
|
|
|
Site Preparation | 8/31/2015 | 8/31/2015 | 8/31/2015 | P | PASS |
Andy J. Long
|
|
|
Inspection requested via web by Erby Gonzales
Brighton Homes' SFHs in progress are currently in compliance. Permit sign posted, subdivision BMPs installed. Approved for excavation.
|