Site Final | 12/3/2015 | 12/3/2015 | 12/4/2015 | P | PASS |
Andy J. Long
|
|
|
Ceclie Phone #: ###-####
Parking lot is complete and surface has been swept and is free of loose sediment. New stormwater drainage system is installed and inlet sediment bag has been removed. Some minor landscaping is finishing up in northwest corner.
Note - unfinished parking area to east of project is not is scope of work. There is some muddy runoff to St. Als private system. Cecil will notify them to install sediment controls.
|
General Inspection | 12/2/2015 | 12/2/2015 | 12/2/2015 | A | PASS |
Andy J. Long
|
|
|
Parking lot addition near completion. Access drive back to parking lot has been swept to reduce amount of loose sediment on pavement. Stormwater retained on site, onsite DI has protection. No trackout. No activity currently, appears some landscaping and lighting needs to be installed.
|
General Inspection | 10/15/2015 | 10/15/2015 | 10/15/2015 | P | PASS |
Andy J. Long
|
|
|
WIP. Trackout is minimal with the stabilized entrance with St. Als being swept. Sediment controls installed on drainage swale, no fugitive dust issues observed. No corrections
|
Site Preparation | 9/14/2015 | 9/15/2015 | 9/15/2015 | A | PASS |
Andy J. Long
|
|
|
Robert Phone #: ###-####
WIP on removing old Rodeway Inn asphalt and to build new parking lot behind where the hotel formerly was. Haul off traffic has been restricted to hard surfaces that are to remain. A water truck will be used to keep the surface rinse off to prevent mud getting on truck tires and tracking out to Curtis.
Stormwater runoff is being directed to a makeshift sediment basin and infiltrating. Sheet flow along access drive goes to vegetated strip via curb cuts. Sediment traps at cuts and can be cleaned post construction.
Approved. Permit sign is posted.
|