Site Final | 11/30/2015 | 11/30/2015 | 11/30/2015 | P | PASS |
Eric Story
|
|
|
final ok
|
Site Preparation | 8/21/2015 | 8/24/2015 | 8/24/2015 | A | PASS |
Andy J. Long
|
|
|
Robert Phone #: ###-####
1 of 3 new SFHs starting simultaneously in new sub "Fairmont Square" . Flat pre-graded parcels, DI bags installed on storm drains. Work to start on Wednesday.
Requested that Wood River Homes provide lined concrete washout pit or container.
|