Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberESC15-01017
StatusFinaled
Name ANDY THOMPSON
Site Address 2005 N LIBERTY ST
Project NamePost st Unit D 3100
Customer Number 
ePlanReviewNo
Description
As per ESC Conditions CON08-00430 EXPIRES 12/11/15
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final5/2/20165/2/20165/2/2016PPASS
DetailsJim Sly
DOC - Permit Finaled5/2/20165/2/20165/2/2016PPASS
DetailsJim Sly
Aging Inspection3/31/20163/31/20163/31/2016 PASS
DetailsEvan Jenkins
General Inspection9/29/201510/2/201510/2/2015PPASS
DetailsAndy J. Long
Site is back in compliance. Corrections completed:

-DI bag installed on Liberty
- Sand bag sediment capture installed on Post
- Permit signs posted
- Sidewalk and gutter swept.
- loose stockpiles and tree trunk debris removed from site and dirt below grade of curbing.

Approved
BMP Violation9/28/20159/29/20159/29/2015PPASS
DetailsAndy J. Long
Check for corrections issued 9/28

Corrections in progress. RP on-site sweeping and monitoring work. Grading directs sheet flow to the west,not east towards Liberty so SF is no longer required along this perimeter. Excess dirt is to be removed this week.. DI bag has been installed and permit signs posted.

Will check back on Friday for futher compliance.
BMP Violation9/28/20159/28/20159/28/2015PCANC
DetailsAndy J. Long
Data entry error, inspection scheduled for 9/29
Complaint Inspection9/28/20159/28/20159/28/2015PFAIL
DetailsAndy J. Long
Loose dirt and sediment on sidewalk, no permit sign, trackout to Liberty street occuring No BMPs installed and no site preparation inspection requested as required by BCC 8-17
.
Warning and correction notice issued to make following corrections:

1. Sweep up sidewalks, gutters, and trackout to streets
2. Post ESC permit sign (s)
3. Install approx. 100 feet of wattle along Liberty Street sidewalk.
4. Install DI bags


If no corrections by tomorrow PM will issue re-inspection fee and potential for Stop Work Order. RP/GC told ACHD he will install DI bags.