Site Final | 4/15/2016 | 4/22/2016 | 4/22/2016 | P | PASS |
Andy J. Long
|
|
|
Street and sidewalk were swept. Yard still not landscaped, but topsoil has been raked . Active CBH projects on Ardyce, temp BMPs to remain installed. No further inspections on this permit.
|
Aging Inspection | 4/14/2016 | 4/14/2016 | 4/15/2016 | | PASS |
Andy J. Long
|
|
|
In process of being landscaped and will need final sidewalk cleanup. BLD already finaled, will check back next week for Final.
|
Site Final | 12/28/2015 | 12/28/2015 | 12/28/2015 | P | FAIL |
Jim Sly
|
|
|
Complete landscaping.
|
General Inspection | 11/25/2015 | 11/25/2015 | 11/25/2015 | P | PASS |
Jim Little
|
|
|
ok
|
Site Preparation | 10/6/2015 | 10/6/2015 | 10/6/2015 | P | PASS |
Andy J. Long
|
|
|
Brett Phone #: ###-####
Approved for construction. Drop Zone sub BMPs installed. Site on Abrams in process of being cleaned as requested 10/5.
|