DOC - Permit Finaled | 6/27/2016 | 6/27/2016 | 6/27/2016 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 6/27/2016 | 6/27/2016 | 6/27/2016 | | PASS |
Andy J. Long
|
|
|
Home complete. Landscaping and final clean up on Brookridge SFHs in DHE#12 is in progress. Tahoe will continue working to the east in DHE phases 13-14. Active homes in compliance and permitted seperately. No further inspections on this permit.
|
Aging Inspection | 4/26/2016 | 4/26/2016 | 4/26/2016 | | PASS |
Andy J. Long
|
|
|
WIP. Near completion. DH#14 Tahoe Homes currently in compliance with DI protection, lined washouts and regular housekeeping.
Approved.
|
Site Final | 2/24/2016 | 2/24/2016 | 2/24/2016 | A | NR |
Phil Shearer
|
|
|
|
Site Preparation | 9/28/2015 | 9/28/2015 | 9/28/2015 | P | PASS |
Andy J. Long
|
|
|
Clint Phone #: ###-####
Ready for construction. Lot pre-graded, sidewalk median landscaped. Access will be from alley. DIs have sediment protection and lined washouts are available.
|