Site Final | 3/18/2016 | 3/18/2016 | 3/18/2016 | P | PASS |
Eric Story
|
|
|
site final ok
|
Stop Work Order | 12/21/2015 | 12/21/2015 | 12/21/2015 | A | PASS |
Evan Jenkins
|
|
|
Sediment discharged offsite onto lower neighbors property. Address BMP corrections
Corrections have been made. SWO lifted
|
Stop Work Order | 12/18/2015 | 12/18/2015 | 12/18/2015 | P | FAIL |
Evan Jenkins
|
|
|
SWO Issued Make ESC Corrections as Directed prior to the removal of SWO
|
Random Inspection | 12/18/2015 | 12/18/2015 | 12/18/2015 | A | FAIL |
Evan Jenkins
|
|
|
Large amount of sediment discharged offsite, onto down slope neighbors. Corrections: 1.) Reinstall Perimeter BMP's 2.) Rake out Gully Erosion Channel 3.) Remove sediment from nieghbors property
|
Random Inspection | 12/9/2015 | 12/9/2015 | 12/9/2015 | A | FAIL |
Evan Jenkins
|
|
|
Multiple BMP violations
Corrections: 1.) Reinstall Silt Fence 2.) Remove Ilicit Concrete Washout and use leak proof containment. 3.) Pick up debris surrounding entire SFH Project and place in Trash Bin that is already onsite.
|
General Inspection | 10/6/2015 | 10/6/2015 | 10/6/2015 | P | PASS |
Andy J. Long
|
|
|
WIP. Perimeter wattles installed. Permit sign posted. No trackout or discharges. Approved.
|
Site Preparation | 9/14/2015 | 9/14/2015 | 9/14/2015 | P | PASS |
Andy J. Long
|
|
|
Dave Phone #: ###-####
ESC permit sign posted, perimeter wattles installed, downstream DIs have sediment protection. Current Canyon Crest homes in Eyrie Canyon in compliance. Approved to excavate.
|