DOC - Permit Finaled | 5/5/2016 | 5/5/2016 | 5/5/2016 | P | PASS |
Andy J. Long
|
|
|
Water line installation area has now revegetatated. No further work in area. Sediment control wattle to remain installed for slope stability and will bio-degrade. No further inspections, EC#7 permit ESC13-00764 is still open.
|
General Inspection | 4/27/2016 | 4/27/2016 | 4/29/2016 | | PASS |
Andy J. Long
|
|
|
no changes at site, no violations
|
General Inspection | 4/12/2016 | 4/12/2016 | 4/12/2016 | | PASS |
Andy J. Long
|
|
|
Disturbed area for water line has been hydroseeded and grass in establishing. Not yet > 70% stabilization. Sediment control wattle is installed at toe of slope. No corrections at this time, will contiue to monitor.
|
Aging Inspection | 3/11/2016 | 3/11/2016 | 3/16/2016 | | PASS |
Andy J. Long
|
|
|
revegetating. Hydroseed is starting to grow.
|
Site Preparation | 8/28/2015 | 8/31/2015 | 8/31/2015 | A | PASS |
Evan Jenkins
|
|
|
Jill Phone #: ###-####
Approved for construction
|