Site Final | 12/15/2015 | 12/15/2015 | 12/15/2015 | A | PASS |
Andy J. Long
|
|
|
Work complete. Site cleaned. No loose sediment or materials. No disturbed area or vegetation at site. ESC permit finaled.
|
Site Preparation | 9/14/2015 | 9/15/2015 | 9/15/2015 | P | PASS |
Andy J. Long
|
|
|
Project will begin. No BMP installations due to site, but will check initial progress for any potential issues..
WIP. Permit sign posted on Washington Street. Sidewalk, grass, and curb to be undisturbed. Staging in parking lot on north side of church. Workers keeping asphalt clean. No discharges or issues observed. Approved.
|
DOC - Permit Finaled | 9/15/2015 | 9/15/2015 | 9/15/2015 | P | PASS |
Andy J. Long
|
|
|
(This activity was added in error so we have changed the case status back to Issued.)
|