DOC - Permit Finaled | 7/3/2017 | 7/3/2017 | 7/3/2017 | P | PASS |
Andy J. Long
|
|
|
ESC inspections for Spotted Dove now conducted on SFH individual ESC permits. No violations. No further ESC inspections on this permit.
|
Aging Inspection | 7/3/2017 | 7/3/2017 | 7/3/2017 | | DONE |
Andy J. Long
|
|
|
|
Aging Inspection | 5/1/2017 | 5/1/2017 | 5/1/2017 | | PASS |
Melissa Jannusch
|
|
|
DI protection removed during last week’s sweeping. Spoke with RP and he will replace within the next couple of days. Correction requested: replace DI bag.
|
General Inspection | 2/27/2017 | 3/1/2017 | 3/3/2017 | P | FAIL |
Andy J. Long
|
|
|
need to get new RP for subdivision, listed RP no longer on project. Current homebuilders are Harding Homes and Stetson Homes.
Need to change MS4 inlet protection at end of street on Edelweiss. WIP on SFHs.
Housekeeping around SFHs (trash collection), street sweeping, and new concrete washout will be required before new homes are approved.
|
Aging Inspection | 2/20/2017 | 2/20/2017 | 2/21/2017 | | CANC |
Melissa Jannusch
|
|
|
Holiday
|
Aging Inspection | 12/19/2016 | 12/19/2016 | 12/21/2016 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 10/17/2016 | 10/17/2016 | 10/18/2016 | | CANC |
Andy J. Long
|
|
|
duplicate inspection
|
General Inspection | 10/18/2016 | 10/18/2016 | 10/18/2016 | P | PASS |
Andy J. Long
|
|
|
Subdivision inlets protected with filter mats, perimeter wattles on some of the open lot. SFH construction in progress, permitted seperately and with corrections.
|
Aging Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 | | PEND |
Evan Jenkins
|
|
|
No activity culdesac has been swept not stabilized
|
BMP Violation | 6/14/2016 | 6/15/2016 | 6/16/2016 | A | PEND |
Evan Jenkins
|
|
|
Check for corrections
sweep culdesac
|
Aging Inspection | 6/14/2016 | 6/14/2016 | 6/14/2016 | | PART |
Evan Jenkins
|
|
|
No activity. Perimeter BMP's could use some maintenance and the far west culdesac needs swept
|
Aging Inspection | 4/13/2016 | 4/13/2016 | 4/13/2016 | | PASS |
Evan Jenkins
|
|
|
Edelweiss and Golden Rod Rds have been paved. No activity at time of inspection. Some heavy equipment onsite
|
Random Inspection | 2/4/2016 | 2/4/2016 | 2/4/2016 | P | PASS |
Jim Little
|
|
|
site has been idle for a while, prepped to pour gutters and pave. ok at this time.
|
Stop Work Order | 12/21/2015 | 12/21/2015 | 12/29/2015 | A | PASS |
Evan Jenkins
|
|
|
Reinspection to see if project is back in compliance
Corrections have been addressed
|
Stop Work Order | 12/16/2015 | 12/16/2015 | 12/16/2015 | P | FAIL |
Evan Jenkins
|
|
|
No BMP's Installed No Site Prep Inspection Requested or performed Worst Trackout issue I've seen in the business --Randy Reutzel is not RP
|
Complaint Inspection | 12/16/2015 | 12/16/2015 | 12/16/2015 | P | FAIL |
Evan Jenkins
|
|
|
Trackout Complaint: No BMP's Installed
SWO Issued: Met Owner Marty Camberlaro onsite and showed him the violations. He stated he will be getting a street sweep onsite asap. I will follow up tomorrow to check progress
|