Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberESC15-01188
StatusFinaled
Name ERIC ALLEN
Site Address 3234 E BIRDSONG CT
Project NameNSFD
Customer Number 
ePlanReviewNo
Description
New Single Family Dwelling (Hillside): Permit for the construction of a new 4,717 sq. ft., two story with a basement level (first story 3,606 sq. ft., second story 509 sq. ft., basement level 602 sq. ft.) single family dwelling with 6 bedrooms, 4.5 bathrooms, approximately 800 sq. ft. of covered patio/porch and a 1,257 sq. ft. attached garage
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final11/15/201611/15/201611/15/2016PDONE
DetailsPhil Shearer
DOC - Permit Finaled11/15/201611/15/201611/15/2016PPASS
DetailsPhil Shearer
General Inspection11/9/201611/9/201611/10/2016 CANC
DetailsAndy J. Long
General Inspection10/25/201610/25/201610/25/2016 CANC
DetailsAndy J. Long
General Inspection10/10/201610/10/201610/11/2016 PASS
DetailsAndy J. Long
Near completion. Grading for yard hydroseeding and landscaping has been completed. Inlets at Windsong have filter mats installed. No trackout or discharges.
General Inspection9/23/20169/23/20169/23/2016 CANC
DetailsAndy J. Long
no issues observed early in week during Boulder Heights round. no inspection performed today
General Inspection9/8/20169/8/20169/9/2016 PART
DetailsAndy J. Long
No trackout or discharges.

Correction:

need to repair DI sediment filter mat next week. Request already issued under ESC15-00094
General Inspection8/24/20168/24/20168/24/2016 PASS
DetailsAndy J. Long
General Inspection8/9/20168/9/20168/9/2016 PART
DetailsAndy J. Long
Installing interior finishes. Natural vegetation preserved well around clearing limits.

- need to clean up around inlets on Birdsong at Windsong and replace filter mats.

Boulder Heights RP stated they will be sweeping dirt around all inlets in phases 5,6,7 this week and has hired an additional maintenance worker.
General Inspection7/25/20167/25/20167/25/2016 PASS
DetailsEvan Jenkins
no issues observed at this time
General Inspection7/8/20167/8/20167/8/2016 PASS
DetailsAndy J. Long
WIP. Hillsides and vegetatation around home footprint have been well preserved. No trackout to culdesac. No corrections requested.
General Inspection6/23/20166/23/20166/23/2016 PASS
DetailsEvan Jenkins
General Inspection6/8/20166/8/20166/8/2016 PASS
DetailsAndy J. Long
General Inspection5/24/20165/24/20165/24/2016 PASS
DetailsEvan Jenkins
Aging Inspection5/5/20165/5/20165/5/2016 PASS
DetailsAndy J. Long
General Inspection3/2/20163/2/20163/2/2016PPART
DetailsAndy J. Long
Foothills existing vegetation in and around parcel has been left undisturbed. No trackout, no accumulated sediment/dirt in gutters or culdesac.

Correction needed:
- conduct maintenance/replace inlet filters at Birdsong and Windsong.
General Inspection12/14/201512/14/201512/14/2015APASS
DetailsAndy J. Long
No activity at site in wet conditions. No trackout. No erosion issues observed around site perimeter. No corrections issued at this time.
General Inspection11/12/201511/12/201511/12/2015APART
DetailsAndy J. Long
Permit sign posted, site materials staying on site and no windblown litter.

Corrections:
- sweep sandy material on driveway apron and parts of culdsace. Install sediment control sandbag tube in gutter to capture/treat runoff
- install perimeter silt fence or wattle below excavated area

No erosion issues, but discussed correction with RP which will occur next week when site becomes active again.

Site Preparation10/6/201510/7/201510/7/2015APASS
DetailsAndy J. Long
Eric Phone #: ###-####

Permit sign posted. Site prep for initial excavation. Homeowner wants to preserve all natural vegetation & sagebrush out side of building footprint. Once backfill around house is complete, perimeter sediment control will be installed.

J&H also to hydroseed across Birdsong on disturbed area and install temporary wattle at toe of slope.

Approved.