General Inspection | 8/31/2016 | 8/31/2016 | 8/31/2016 | | PASS |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 8/31/2016 | 8/31/2016 | 8/31/2016 | P | PASS |
Evan Jenkins
|
|
|
Temp BMP's have been removed ESC conditions satisfied
|
General Inspection | 8/16/2016 | 8/16/2016 | 8/16/2016 | | PEND |
Evan Jenkins
|
|
|
Straw waddles have been removed, but all Drop Inlet Protection is sill in place. Contacted Shayne (RP) and left VM to remove those BMP's prior to ESC permit being finaled
|
General Inspection | 8/1/2016 | 8/1/2016 | 8/1/2016 | | PEND |
Andy J. Long
|
|
|
still need to remove the inlet bags on Collister. No issues on site
|
General Inspection | 7/15/2016 | 7/15/2016 | 7/15/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 6/30/2016 | 6/30/2016 | 6/30/2016 | | PEND |
Evan Jenkins
|
|
|
remove temp BMP's
|
General Inspection | 6/15/2016 | 6/15/2016 | 6/16/2016 | | PASS |
Andy J. Long
|
|
|
Site is now adequately vegetated.
Spoke with Shane @ Cutting Edge. This week or next he will have temp BMPs removed: - wattles around culdesac and upper storm drain - remove 3 x sediment filters from DIs - take down ESC permit sign
Shane stated he would call once this was complete for a site final.
|
General Inspection | 5/27/2016 | 5/31/2016 | 5/31/2016 | A | PEND |
Evan Jenkins
|
|
|
Remove temp drop inlet protection and straw waddles.
|
General Inspection | 5/27/2016 | 5/27/2016 | 5/27/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled for 5/31
|
General Inspection | 5/12/2016 | 5/12/2016 | 5/12/2016 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 4/1/2016 | 4/1/2016 | 4/1/2016 | | PEND |
Andy J. Long
|
|
|
in process of revegetating. No violations.
|
Site Preparation | 9/24/2015 | 9/24/2015 | 9/24/2015 | P | PASS |
Evan Jenkins
|
|
|
Permit posted on fence near entry gate. Straw waddles installed throughout project. Approved for Construction
|