Site Final | 5/20/2016 | 5/20/2016 | 5/20/2016 | P | DONE |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 5/20/2016 | 5/20/2016 | 5/20/2016 | P | PASS |
Phil Shearer
|
|
|
|
Aging Inspection | 5/5/2016 | 5/5/2016 | 5/5/2016 | | PASS |
Andy J. Long
|
|
|
Near completion. Entire block needs landscaping and final site clean up. NO discharges, no trackout. BMPs installed in sub.
|
Site Preparation | 10/19/2015 | 10/19/2015 | 10/19/2015 | P | PASS |
Andy J. Long
|
|
|
Clint Phone #: ###-####
Site is ready for construction. Subdivision BMPs (DI sediment protection, concrete washouts) are installed and being utilized. No trackout, dust issues, or windblown trash issues from active Tahoe sites in DH#12 at this time. Approved.
|