DOC - Permit Finaled | 4/27/2016 | 4/27/2016 | 4/27/2016 | P | PASS |
Andy J. Long
|
|
|
First set of DHE Parkcenter Blvd townhomes is complete, landscaped, and cleaned. DI bags and other temp BMPs to remain until all units complete. No violations at site. All permits finaled.
|
Site Preparation | 10/19/2015 | 10/19/2015 | 10/19/2015 | P | PASS |
Andy J. Long
|
|
|
Clint Phone #: ###-####
Clint Phone #: ###-####
First set of 4 DH Estates on corner of Perrault and Parkcenter. Permit sign posted. RP in process of finalizing preparations.
1. Cement washout to be installed on open parcel next to projects. 2. 2.x DI bags need to be installed in alley way where access and driveways will be.
BMPs should be installed tomorrow, approved to start initial excavation. Test pits reveal ground water at approximately 10-12 feet at this time.
|