Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberESC15-01256
StatusFinaled
Name SHANE JAYO
Site Address 2048 N PAINTED ROCK LN
Project NameNSFD
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 2,168 sq. ft., two story (main level 1,526 sq. ft., finished basement 642 sq. ft.) single family dwelling with 3 bedrooms, 2 and a half bathrooms, approximately 189 sq. ft. of covered patio/porch and a 600 sq. ft. attached garage
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection11/15/201611/15/201611/15/2016 PASS
DetailsAndy J. Long
Home complete, landscaped and occupied. BLD finaled. No ESC corrections needed, temporary BMPs in Somerset Village to remain while active construction on other lots is ongoing.
DOC - Permit Finaled11/15/201611/15/201611/15/2016PPASS
DetailsAndy J. Long
General Inspection10/31/201610/31/201610/31/2016 PART
DetailsAndy J. Long
Need to repair access road for equipment in backyard from Sand Dune. BLD finaled, will final up repair and re-installation of BMPs behind homes on Painted Rock.
General Inspection10/14/201610/14/201610/14/2016 PASS
DetailsAndy J. Long
General Inspection9/29/20169/29/20169/29/2016 CANC
DetailsAndy J. Long
General Inspection9/14/20169/14/20169/14/2016 PEND
DetailsAndy J. Long
Home complete and BLD finaled. Not fully landscaped and needs further stabilization and street cleanup.
General Inspection8/30/20168/30/20168/30/2016 PEND
DetailsEvan Jenkins
disturbed areas need perminately stabilized via sod/hydroseeding or landscaping prior to ESC permit being Finaled.
No ESC issues observed at this time
General Inspection8/15/20168/15/20168/15/2016 PASS
DetailsAndy J. Long
Home complete but not yet landscaped/stabilized. Active projects exist on both sides of home. No violations, no corrections requested.
General Inspection7/29/20167/29/20167/29/2016 PASS
DetailsAndy J. Long
Home construction complete. Not yet landscaped/stabilized. Active projects on both sides. Painted Rock will need final site clean up to get ESC permits closed. No discharges or pollution sources onsite.
General Inspection7/14/20167/14/20167/14/2016 PASS
DetailsEvan Jenkins
WIP: No Issues observed at this time
General Inspection6/29/20166/29/20166/29/2016 PASS
DetailsAndy J. Long
General Inspection6/14/20166/14/20166/14/2016 PASS
DetailsAndy J. Long
Site Final5/24/20165/26/20165/26/2016ANR
DetailsAndy J. Long
General Inspection5/24/20165/24/20165/24/2016 CANC
DetailsAndy J. Long
rescheduled for site final 5/26
Tracking Control2/10/20162/10/20162/10/2016PFAIL
DetailsAndy J. Long
Observed uncleaned trackout from site since end of week.

Verbal correction issued to Justin Jayo to clean up and train employees & sub-contractors about preventing and cleaning track out.
General Inspection12/30/201512/30/201512/30/2015PPART
DetailsAndy J. Long
WIP on frame. No significant trackout and no discharges. Trash and materials are contained.

Correction:

Need to sweep up sawdust and sand in front of driveway on street and gutter.
Site Preparation10/26/201510/27/201510/27/2015APASS
DetailsAndy J. Long
Justin Phone #: ###-####

Permit sign posted on site. RP and I conducted walk through. Wattles listed on ESC plan for perimeter control are only required at the toe of slope at edge pavement on Painted Rock.

Adjacent stockpile will be utilized for some backfill. DI bag installed in front of lot is less that 25% capactity. Somerset 3 active projects in good condition. RP stated two small material stockpiles will be hauled of this week. Concrete washout located in upper section.

Approved.