Site Final | 6/28/2016 | 6/28/2016 | 6/28/2016 | A | PASS |
Andy J. Long
|
|
|
Work complete. Parking lot regraded, site improvement areas are stabilized/landscaped. Area was swept up and no more construction materials on site. ESC conditions satisfied.
|
General Inspection | 6/27/2016 | 6/27/2016 | 6/27/2016 | | PASS |
Andy J. Long
|
|
|
|
Site Final | 5/9/2016 | 5/11/2016 | 5/11/2016 | P | NR |
Andy J. Long
|
|
|
Landscaping and utility/irrigation line work associated with parking lot expansion is still in progress. Disturbed area and materials still onsite. No sediment runoff, discharges, or trackout. Will check back in 2 weeks.
|
Random Inspection | 4/5/2016 | 4/5/2016 | 4/5/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on Surprise Valley Clubhouse parking lot project. No trackout, clean site and staging area. No violations observed.
|