Permit Information
Permit NumberESC15-01287
StatusFinaled
Name CLIVE CULPAN
Site Address 386 N STRATA VIA PL
Project NameMcbeath SFD
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 4470 sq. ft., two story (first story 3036 sq. ft., second story 1488 sq. ft.) single family dwelling with 4 bedrooms, 4 bathrooms and 2 half bathrooms, approximately 944 sq. ft. of covered patio/porch and a 968 sq. ft. attached garage
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection11/24/201611/24/201611/25/2016 PASS
DetailsAndy J. Long
Home complete, landscaped and occupied. No temporary BMPs remain. ESC condtions satisfied.
DOC - Permit Finaled11/25/201611/25/201611/25/2016PPASS
DetailsAndy J. Long
General Inspection11/9/201611/9/201611/10/2016 PEND
DetailsAndy J. Long
Site Final10/24/201610/25/201610/27/2016PNR
DetailsAndy J. Long
Home now landscaped and near final completion. Porta pot and DI bag on MS4 still installed. Sediment filter bag needs to be removed.
General Inspection10/24/201610/24/201610/24/2016 CANC
DetailsAndy J. Long
rescheduled for site final
Site Final10/6/201610/7/201610/7/2016PNR
DetailsAndy J. Long
Home is now landscaped. Final trash haul off and street clean up required. Temp BMP silt satchel removed from the receiving storm drain. NO violations, just not ready for final.
Site Final9/29/201610/3/201610/6/2016PCANC
DetailsAndy J. Long
General Inspection9/29/20169/29/20169/29/2016 CANC
DetailsAndy J. Long
rescheduled for site final on 10/3
General Inspection9/14/20169/14/20169/14/2016 PART
DetailsEvan Jenkins
sweep. fix silt fence
General Inspection8/30/20168/30/20168/30/2016 PART
DetailsAndy J. Long
Sidewalk sweep up and sweeping loose sediment requested to RP. No discharges, WIP on landscaping and boulder placement.
General Inspection8/15/20168/15/20168/15/2016 PASS
DetailsAndy J. Long
Home near completion, not yet landscaped.

DI bag installed on receiving MS4. Sidewalk and gutter will need thorough sweeping. Reminded RP to be sure and take out DI bags since there are no active projects remaining on Strata Via after this SFH is complete
General Inspection7/29/20167/29/20167/29/2016 PASS
DetailsAndy J. Long
General Inspection7/14/20167/14/20167/14/2016 PEND
DetailsEvan Jenkins
still awaiting for re-veg
General Inspection6/29/20166/29/20166/29/2016 PEND
DetailsEvan Jenkins
re-veg then remove temp BMP's
General Inspection6/14/20166/14/20166/14/2016 PASS
DetailsAndy J. Long
General Inspection5/27/20165/27/20165/27/2016 CANC
DetailsAndy J. Long
Random Inspection4/28/20164/28/20164/28/2016APASS
DetailsBob Reichert
looked ok
Random Inspection4/4/20164/4/20164/4/2016PPART
DetailsAndy J. Long
WIP. No significant trackout and BMPs are installed (perimeter wattle, DI bag). Some accumulations of foot trackout dirt is on the sidewalk and road needs sweeping.

CN:
- increase regular sweeping
- pay outstanding Special Investigation Fee for prior issues of non-compliance at site.
BMP Violation2/24/20162/24/20162/24/2016PPASS
DetailsAndy J. Long
Site has completed corrective actions to come into a good level compliance.

- perimeter wattles now properly installed.
- unauthorized site entance from adjacent lot has been stopped and pit run driveway area installed.
- uncontained trash and materials were removed from site
- street, sidewalk, and gutter were swept. Street sweeper did work on the road.

Adjacent site by same builder also in compliance.

corrections remaining:
- empty out and reinstall DI bag
- pay fees assessed due to multiple failed inspections.

BMP Violation2/16/20162/16/20162/16/2016PFAIL
DetailsAndy J. Long
Does not appear that gutter with cement spill and oil stained dirt were cleaned up. Grey water and sludge still in inlet. Multiple visits to site have resulted in failed inspections and issues.

RP did not address the spill as requested. Rained over weekend causing stormwater pollution. Street in front of homes by builder still have a lot of loose sedimet.

Special Investigation Fee assessed on ESC permit.
Conference2/9/20162/11/20162/12/2016AFAIL
DetailsAndy J. Long
Wattles and entrance installed on site as requested. Some clean of site has occurred.

Cement sludge and dirt from site in gutter that has towards the storm drain. Cement truck dripped oil. Mud smells like oil.

Clean up is needed ASAP with re-inspection required Tuesday.
General Inspection2/5/20162/9/20162/9/2016PPEND
DetailsAndy J. Long
Follow up to tracking control inspection

Site is still in process of backfill and cleanup operations each day. Conference to be held Thursday with RP-GC Clive to get site all BMPs for rest of project to be in compliance.
Complaint Inspection2/5/20162/5/20162/5/2016PFAIL
DetailsAndy J. Long
Trackout and backfill/foundation materials (sand, drain rock) stockpiled in road making muddy situation.

RP has not yet installed BMP for perimeter sediment control. Workers using adjacent lot as an entrance and destroying vegetation making mud.

Conference/inspection with RP Clive called for Monday morning to make corrections early in week.
BMP Violation12/10/201512/10/201512/10/2015PFAIL
DetailsAndy J. Long
Need to post yellow permit sign
Need to install perimeter sediment control
Need to provide stabilized site entrance
General Inspection11/30/201511/30/201511/30/2015PPART
DetailsAndy J. Long
Permit sign is now posted and excavation is complete, DIs have protection.

Correction:
-sweep up loose sediment on Strata Via as it thaws.
- install construction entrance.
- install silt fence or wattle along toe of slope at sidewalk.

Site Preparation11/19/201511/20/201511/20/2015APART
DetailsAndy J. Long
WIP. Wattles on site and ready to be installed. Entrance is not yet built. Area of excavation is surrounded by preserved perimeter vegetation..

Need to post yellow sign - requested issued to RP-GC. No sediment leaving site. Will check for BMPs early next week.
Site Preparation11/19/201511/19/201511/19/2015ACANC
DetailsAndy J. Long
rescheduled for 11/20 AM. Discussed project with RP-GC . Approved for initial excavation today