Site Final | 7/26/2016 | 7/26/2016 | 7/26/2016 | P | PASS |
Andy J. Long
|
|
|
Home complete and landscaped/stabilized. No waste construction materials left in adjacent lot. No disturbed area or temporary BMPs remaining. All permits finaled.
|
General Inspection | 6/17/2016 | 6/17/2016 | 6/17/2016 | A | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 6/10/2016 | 6/13/2016 | 6/14/2016 | P | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 6/10/2016 | 6/10/2016 | 6/10/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled for 6/13
|
General Inspection | 3/31/2016 | 3/31/2016 | 3/31/2016 | P | PASS |
Andy J. Long
|
|
|
WIP. No trackout. Trash and materials contained. No corrections.issued, site in compliance.
|
General Inspection | 12/3/2015 | 12/3/2015 | 12/3/2015 | P | PASS |
Bill VanDegrift
|
|
|
site looks good no trackout
|
Site Preparation | 11/6/2015 | 11/6/2015 | 11/6/2015 | P | PASS |
Evan Jenkins
|
|
|
Scott-please call 1 hr prior to meet Phone #: ###-####
Approved for construction
|