DOC - Permit Finaled | 6/1/2016 | 6/1/2016 | 6/1/2016 | P | PASS |
Andy J. Long
|
|
|
Townhome complete, landscaped and occupied. DI bags in alley to be removed by Brighton once all MSD projects are complete. Should be done before end of summer.
|
Site Preparation | 11/5/2015 | 11/5/2015 | 11/5/2015 | P | PASS |
Andy J. Long
|
|
|
Inspection requested via web by Erby Gonzales
Townhome excavation in progress. Excess dirt offhauled and hard surfaces swept. Permit sign posted on Mill Station. DI in alley has sediment protection installed. Approved.
|