General Inspection | 9/19/2016 | 9/19/2016 | 9/19/2016 | | PASS |
Andy J. Long
|
|
|
Home complete and landscaped. Temp BMPs in Somerset to be removed when all active projects on Mesa Verde and Painted Rock are complete. No further ESC inspections on this permit, conditions satisfied.
|
DOC - Permit Finaled | 9/19/2016 | 9/19/2016 | 9/19/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/2/2016 | 9/2/2016 | 9/2/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 8/18/2016 | 8/18/2016 | 8/18/2016 | | PASS |
Evan Jenkins
|
|
|
site is in good shape at this time
|
General Inspection | 8/3/2016 | 8/3/2016 | 8/3/2016 | | PASS |
Evan Jenkins
|
|
|
Near Completion No ESC issues observed at time of inspection
|
General Inspection | 7/19/2016 | 7/19/2016 | 7/19/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 7/1/2016 | 7/1/2016 | 7/1/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/15/2016 | 6/15/2016 | 6/15/2016 | | PASS |
Andy J. Long
|
|
|
WIP on frame. Somerset Village BMPs installed. No trackout or discharges occuring. No loose trash or debris. Approved.
|
General Inspection | 5/27/2016 | 5/27/2016 | 5/27/2016 | | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 12/2/2015 | 12/3/2015 | 12/3/2015 | A | PASS |
Andy J. Long
|
|
|
Shane Phone #: ###-####
Approved for construction. Site map calls for entire perimeter wattles, wattles only need at edge of pavement along Painted Rock. Somerset Village currently in compliance.
|