Site Final | 11/14/2016 | 11/14/2016 | 11/14/2016 | P | PASS |
Andy J. Long
|
|
|
Home complete and occupied. Hillside bond applied. Culdesac is paved and vegetation along Pierce Gulch has been preserved. Approved.
|
General Inspection | 11/1/2016 | 11/1/2016 | 11/1/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/14/2016 | 10/14/2016 | 10/14/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/29/2016 | 9/29/2016 | 9/29/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/14/2016 | 9/14/2016 | 9/14/2016 | | PEND |
Evan Jenkins
|
|
|
pending establishment of vegetation
|
General Inspection | 8/30/2016 | 8/30/2016 | 8/30/2016 | | PEND |
Evan Jenkins
|
|
|
awaiting for hydroseed to become established. no issues observed at this time
|
General Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 | | PEND |
Evan Jenkins
|
|
|
disturbed areas have been hydroseeded, but has not been established. No esc issues observed
|
General Inspection | 7/29/2016 | 7/29/2016 | 7/29/2016 | | PEND |
Evan Jenkins
|
|
|
SFH is complete pending perminate re-vegetation
|
General Inspection | 7/14/2016 | 7/14/2016 | 7/14/2016 | | CANC |
Evan Jenkins
|
|
|
|
General Inspection | 6/29/2016 | 6/29/2016 | 6/29/2016 | | PASS |
Evan Jenkins
|
|
|
No ESC issues observed at this time
|
General Inspection | 6/9/2016 | 6/14/2016 | 6/15/2016 | A | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 6/9/2016 | 6/9/2016 | 6/9/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled for next week
|
Site Preparation | 11/2/2015 | 11/3/2015 | 11/3/2015 | A | PASS |
Andy J. Long
|
|
|
John Phone #: ###-####
Permit sign is posted, perimeter gator guard wattles have been trenched and staked properly. Large open culdesac can be used for worker parking, will install entrance once footpring of home is excavated. Project approved for construction.
|
Site Final | 11/1/2016 | 11/4/2016 | | P | |
Andy J. Long
|
|
|
|