Permit Information
Permit NumberESC15-01362
StatusFinaled
Name BRYAN MURDOCH
Site Address 2825 E HARD ROCK DR
Project NameBoulder Heights SFH
Customer Number 
ePlanReviewNo
Description
Hillside New Single Family Dwelling. ESC plan submitted. BMP installation and site preparation inspection required prior to excavation. Project duration scheduled November to April. BMPs include fiber wattles along east lot line, spill kit onsite, designated construction entrance, housekeeping, and requirement to clean up any trackout that occurs.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final6/2/20166/2/20166/2/2016PDONE
DetailsPhil Shearer
DOC - Permit Finaled6/2/20166/2/20166/2/2016PPASS
DetailsPhil Shearer
Random Inspection3/25/20163/25/20163/25/2016PPASS
DetailsAndy J. Long
No trackout. No loose sediment on sidewalk & gutter. No BMP failures observed. Site is in compliance.
General Inspection3/2/20163/2/20163/2/2016PPASS
DetailsAndy J. Long
No violations observed. WIP. Housekeeping duties satisfied. Hillside vegetation and boulders left undisurbed below home.
Random Inspection2/5/20162/5/20162/5/2016PPASS
DetailsAndy J. Long
Roadway and sidewalks clean. No discharges or sediment accumulations in gutter. Trash and materials constained. No corrections issued.
Complaint Inspection1/8/20161/8/20161/8/2016PPEND
DetailsAndy J. Long
Complaint received regarding trackout and excessive mud on sidewalk.

Site has some minor trackout, mainly from boot traffic. Mud is very sticky in this area and also wet at the time, making conditions very difficult to keep clean.

RP stated job is swept and cleaned at end of each day, which is evident due to lack of large accumulations. Will re-inspect site next week to see if any further clean up or street sweeping should be required.
BMP Violation12/11/201512/11/201512/14/2015PPASS
DetailsAndy J. Long
Follow up to ensure project is back in compliance and corrections have been made

Rebar and materials moved out of ROW as requested. Some rebar in gutter will be removed ASAP but is no longer obstructing vehicle or pedestrian traffic.

RP onsite, discuss further clean up of sidewalk as conditions allow, still needs some work. Roadway was swept and mud clods removed Friday PM.

Will continue to montior. Rear silt fence BMP and preserved vegetation in good condition.
Complaint Inspection12/11/201512/11/201512/11/2015PFAIL
DetailsEvan Jenkins
Trackout Complaint

Significant amount of mud and debris covering sidewalk and curb. Rebar and other building materials in ACHD's ROW needs to removed also. WIll follow up this afternoon.
Corrections:
1.) Shovel and sweep mud off sidewalk and curb back onto lot.
2.) Remove building materials out of ACHD's ROW
Site Preparation11/12/201511/12/201511/12/2015PPASS
DetailsAndy J. Long
Brain Phone #: ###-####

Permit sign posted, perimeter silt fence installed. RP familiar with BMPs and permit conditions, current Lasher project in Boulder Heights in compliance. Approved for excavation.