Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberESC15-01369
StatusFinaled
Name MARK GOLDY
Site Address 15 S LEONA CIR
Project Name 
Customer NumberBLD11-02424
ePlanReviewNo
Description
New Single Family Dwelling (previous Demolition)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection6/27/20176/27/20176/28/2017 PASS
DetailsAndy J. Long
Home complete and occupied. No temp BMPs in storm drains and no loose material in gutter around site. Homeowner in process of landscaping, some wattles still in place. ESC permit finaled, no further insepctions
DOC - Permit Finaled6/28/20176/28/20176/28/2017PPASS
DetailsAndy J. Long
Aging Inspection4/25/20174/25/20174/25/2017 CANC
DetailsMelissa Jannusch
Aging Inspection2/21/20172/21/20172/21/2017 CANC
DetailsMelissa Jannusch
Aging Inspection12/20/201612/20/201612/21/2016 CANC
DetailsAndy J. Long
Site Final10/19/201610/19/201610/20/2016PPART
DetailsJim Storey
wip
Aging Inspection9/9/20169/9/20169/9/2016 PASS
DetailsAndy J. Long
WIP on exterior and interior finishes. Foundation and frame complete ESC permit sign clearly posted. No trackout, discharges, or uncontained washout. Site is in compliance
General Inspection4/19/20164/25/20164/25/2016APASS
DetailsAndy J. Long
follow up to corrections requested 4/19

RP cleaned up loose dirt in street and installed sediment filter bag on the storm drain drop inlet.

Permit sign posted, perimeter wattles installed. RP-GC onsite. Site is back in compllance.
BMP Violation4/18/20164/19/20164/19/2016PPART
DetailsAndy J. Long
Some sweep up of apron on east side of circle has been completed. Significant amount of dirt left in gutter.

John Brown excavator, called yesterday sweeping was complete. Job was only partially swept. No DI sediment control installed.

Verbal correction request to Mark Goldy to finish sweeping and install sediment control to prevent loose material from entering storm drain.

Will check back early next week.
Tracking Control4/18/20164/18/20164/18/2016PFAIL
DetailsRex Boyles
schedule insp rocks and debris in road
Site Preparation4/6/20164/6/20164/6/2016APASS
DetailsMike Jordan