DOC - Permit Finaled | 6/3/2016 | 6/3/2016 | 6/3/2016 | P | PASS |
Andy J. Long
|
|
|
Home complete, BLD finaled. Yard landscaped. HHS will remove DI bags and final clean up when all SFHs on block complete. No ESC corrections.
|
Site Preparation | 1/19/2016 | 1/19/2016 | 1/19/2016 | P | PART |
Evan Jenkins
|
|
|
Earth disturbing activities have already commenced prior to site prep inspection approval. Contacted RP Austin and reminded him that no earth disturbing activities can occur prior to the required site prep inspection approval process. Also, entire Shadywood Way needs to be swept from excessive tracking. He has a sweeper schedualed for tomorrow 1-20-16. Will follow up to verify in the afternoon. Permit Posted
|