DOC - Permit Finaled | 6/16/2016 | 6/16/2016 | 6/16/2016 | P | PASS |
Andy J. Long
|
|
|
Home complete, landscaped and stabilized. Temp BMPs in RH#6 to remain installed while rest of homes are completed.
|
Aging Inspection | 6/16/2016 | 6/16/2016 | 6/16/2016 | | PASS |
Andy J. Long
|
|
|
|
Random Inspection | 11/25/2015 | 11/25/2015 | 11/25/2015 | P | PASS |
Eric Strole
|
|
|
|
Site Preparation | 11/18/2015 | 11/18/2015 | 11/18/2015 | P | PART |
Andy J. Long
|
|
|
Yellow card on site Inspection requested via web by Erby Gonzales
ESC permit sign posted. Multiple projects in progress by Brighton on Signal Rock. Street needs to be swept at end of each week.
Correction for Brighton Homes/River Heights #7
- pick up windblown trash from construction sites that has accumulated on the south side (river side) of Warm Springs.
Approved to start, will issue correction also on RH #6 permit ESC14-00657.
|