Aging Inspection | 7/6/2016 | 7/6/2016 | 7/7/2016 | | PASS |
Andy J. Long
|
|
|
Work complete. Front parcel undeveloped. Yard is landscaped, driveway is complete. No sediment leaving site.
|
DOC - Permit Finaled | 7/7/2016 | 7/7/2016 | 7/7/2016 | P | PASS |
Andy J. Long
|
|
|
|
Site Final | 5/5/2016 | 5/5/2016 | 5/6/2016 | P | CANC |
Jim Sly
|
|
|
|
Site Preparation | 12/14/2015 | 12/15/2015 | 12/15/2015 | A | PASS |
Evan Jenkins
|
|
|
would like call ahead; Dave Phone #: ###-####
Permit Posted on wooden fence along south side of lot. Construction Entrance Installed. Very Flat Lot. SFH will be constructed approximately 180-200ft from Linda Vista Ln. Approved for construction
|