Site Final | 8/10/2016 | 8/10/2016 | 8/10/2016 | A | PASS |
Andy J. Long
|
|
|
Grading and vertical work complete at new hangar. No construction materials or BMPs on site. ESC conditions satisfied.
|
General Inspection | 6/29/2016 | 6/29/2016 | 6/29/2016 | | PASS |
Andy J. Long
|
|
|
WIP. Minor trackout to Orchard, no MS4 in area. Airport hangar frame is complete, parking lot area paved. No fugitive dust or discharges observed. Trash and materials are contained on site.
|
General Inspection | 5/13/2016 | 5/13/2016 | 5/13/2016 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 4/7/2016 | 4/7/2016 | 4/7/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on hangar building with support offices. No trackout to Orchard, construction entrance installed. Perimeter BMPs in place in runoff potential locations. No spills or discharges in staging area observed. NO corrections at this time.
See also ESC15-01558 for project
|
Site Preparation | 11/23/2015 | 11/23/2015 | 11/23/2015 | P | PASS |
Andy J. Long
|
|
|
Approved for grading and initial site construction for new Hangar. No MS4 inlets in the airport industrial area. Staging area is paved and existing pavement will be preserved. The site has asphalt chips that will be used as a construction entrance. A construction tracking pad may be necessary to connect the parcel to Orchard over the drainage ditch and shoulder.
SWPPP located in job trailer. Site has CGP permit filed.
Approved for excavation.
|