Site Final | 6/21/2016 | 6/21/2016 | 6/21/2016 | P | DONE |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 6/21/2016 | 6/21/2016 | 6/21/2016 | P | PASS |
Phil Shearer
|
|
|
|
General Inspection | 5/19/2016 | 5/19/2016 | 5/19/2016 | P | PASS |
Andy J. Long
|
|
|
WIP. Portable concrete washout was used for driveway pour. No trackout or muddy runoff. Trash contained, RP onsite. Approved
|
Random Inspection | 5/12/2016 | 5/12/2016 | 5/12/2016 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Site Preparation | 12/16/2015 | 12/17/2015 | 12/17/2015 | A | CANC |
Andy J. Long
|
|
|
data entry error
|
Tracking Control | 11/30/2015 | 11/30/2015 | 11/30/2015 | P | FAIL |
Andy J. Long
|
|
|
Trackout by foundation crew left uncleaned.
Request to RP for Lasher to have sidewalk and street swept in front of home.
|
Random Inspection | 11/19/2015 | 11/19/2015 | 11/19/2015 | A | FAIL |
Evan Jenkins
|
|
|
Stockpile covering/blocking sidewalk and curb
Remove Stockpile from sidewalk and curb. Turbid water entering MS4 from rains
|
Site Preparation | 11/12/2015 | 11/13/2015 | 11/13/2015 | A | PASS |
Evan Jenkins
|
|
|
Bryan Phone #: ###-####
Permit Posted with contact information. Approved for Construction
|