General Inspection | 11/28/2016 | 11/28/2016 | 11/28/2016 | | PASS |
Andy J. Long
|
|
|
Work on building shell complete. No tenants at this time. No disturbed area or loose materials on site. Okay for DI bag to remain on private drain in alley parking lot. NO temp BMPs in MS4 or ROW. ESC conditions satisfied.
|
DOC - Permit Finaled | 11/28/2016 | 11/28/2016 | 11/28/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/10/2016 | 10/11/2016 | 10/10/2016 | P | PASS |
Andy J. Long
|
|
|
Frame of building complete. Parking lot and onsite storm water drainage installed. Drop inlet has sediment filter material covering grate. Concrete washout pan utilized. No trackout, no fugitive dust. No corrections at this time.
|
General Inspection | 10/7/2016 | 10/7/2016 | 10/10/2016 | | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 10/10/2016 | 10/11/2016 | 10/10/2016 | P | CANC |
Andy J. Long
|
|
|
data entry error
|
General Inspection | 8/22/2016 | 8/22/2016 | 8/22/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/13/2016 | 7/13/2016 | 7/13/2016 | | PEND |
Evan Jenkins
|
|
|
BLD is currently under review No ESC issues observed at this time
|