Site Final | 8/28/2017 | 8/29/2017 | 8/29/2017 | P | PASS |
Andy J. Long
|
|
|
Swale area is now vegetated, site is stabilized and temporary BMPs are removed.
|
General Inspection | 7/24/2017 | 7/24/2017 | 7/24/2017 | | CANC |
Andy J. Long
|
|
|
See ESC 15-00853
|
Aging Inspection | 6/7/2017 | 6/7/2017 | 6/8/2017 | | PASS |
Andy J. Long
|
|
|
|
Site Final | 4/7/2017 | 4/27/2017 | 4/28/2017 | P | PEND |
Andy J. Long
|
|
|
site still revegetating
|
General Inspection | 4/7/2017 | 4/7/2017 | 4/7/2017 | | PASS |
Andy J. Long
|
|
|
Landscaping in progress at west end of parking lot. Swale on east side of building has been hydro-mulched but grass is not yet growing. MS4 on Fairview still has sediment bag installed. Need to remove temporary BMPs after landscaping/re-vegetation is complete. BLD already finaled. NO sediment or other materials leaving site.
|
General Inspection | 2/20/2017 | 2/20/2017 | 2/21/2017 | | CANC |
Melissa Jannusch
|
|
|
Holiday
|
General Inspection | 1/3/2017 | 1/3/2017 | 1/5/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/18/2016 | 11/18/2016 | 11/18/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/3/2016 | 10/3/2016 | 10/4/2016 | | PASS |
Andy J. Long
|
|
|
Permit sign posted, private storm drains within site and the MS4 on Fairview have sediment protection installed and in good codition. Need to stabilize the recent trenching in front of building and make sure that stockpiles do not cause sediment runoff.
|
General Inspection | 8/17/2016 | 8/17/2016 | 8/17/2016 | | PASS |
Andy J. Long
|
|
|
Frame for building is up, foundation and earthwork complete;
Parking lot was paved previously and is used as staging area. Permit sign posted on fence. No trackout or discharges. Approved.
|
General Inspection | 7/1/2016 | 7/1/2016 | 7/1/2016 | | PASS |
Andy J. Long
|
|
|
Work on frame is in progress. Permit sign posted, MS4 on Fairview has inlet sediment filter bag installed. No trackout or discharges.
|
General Inspection | 5/9/2016 | 5/9/2016 | 5/9/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on foundation. Permit sign posted, DI on Fairview has inlet sediment bag installed.
|