General Inspection | 8/17/2016 | 8/17/2016 | 8/17/2016 | | PASS |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Evan Jenkins
|
|
|
Project Complete ESC Conditions Satisfied
|
Site Final | 7/29/2016 | 7/29/2016 | 7/29/2016 | P | NR |
Andy J. Long
|
|
|
Need to clean up loose dirt around site perimeter in alley. Appears some still occuring on the Children School playground across alley...will monitor for further clean up/stabilization.
|
General Inspection | 7/20/2016 | 7/20/2016 | 7/20/2016 | | PEND |
Evan Jenkins
|
|
|
re-veg. No discharges leaving the site at time of inspection
|
General Inspection | 7/4/2016 | 7/4/2016 | 7/4/2016 | | CANC |
Evan Jenkins
|
|
|
holiday
|
General Inspection | 3/22/2016 | 3/24/2016 | 3/25/2016 | A | PASS |
Andy J. Long
|
|
|
check up to see if trackout still a problem
Street sweeping perfomed on Thatcher and 9th as requested. Approved
|
Tracking Control | 3/22/2016 | 3/22/2016 | 3/22/2016 | A | PART |
Andy J. Long
|
|
|
Correction request to onsite CSDI supervisor Mark to clean up trackout from alley to Thatcher and 9th Street.
Currently they are off-hauling basement excavation dirt and plan to be done tomorrow. Sweeper truck has been ordered for Wednesday afternoon.
Mark is going to wash wheels in the meanwhile, I requested that water must not runoff site to MS4. MS4 inlets are filled with leaves and debris so waived need for filter bags at this time.
|