Site Final | 6/13/2016 | 6/13/2016 | 6/13/2016 | P | DONE |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 6/13/2016 | 6/13/2016 | 6/13/2016 | P | PASS |
Phil Shearer
|
|
|
|
General Inspection | 3/29/2016 | 3/29/2016 | 3/29/2016 | P | PART |
Andy J. Long
|
|
|
Sweep up and DI bag maintenance request to RP-GC Rod. Some loose sediment is in the gutter down from Alturas sites in RH#5. Also reminded Alturas Construction to be sure to remove the DI bag on Basin Falls once all projects are complete. Rod stated they plan to be done by August....
|