General Inspection | 10/10/2016 | 10/10/2016 | 10/10/2016 | | PASS |
Andy J. Long
|
|
|
Project covered under main ESC permit for Afton, see ESC15-01184
|
DOC - Permit Finaled | 10/10/2016 | 10/10/2016 | 10/10/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/23/2016 | 9/23/2016 | 9/26/2016 | | PASS |
Andy J. Long
|
|
|
No trackout. Construction entrances installed. All surround DIs have sediment filter bags installed. No loose trash or debris around perimeter. Approved.
|
General Inspection | 9/8/2016 | 9/8/2016 | 9/8/2016 | | PASS |
Andy J. Long
|
|
|
Vertical construction in progress. Construction entrance preventing trackout. No spills or discharges observed. MS4 inlets have sediment protection. Approved.
|
General Inspection | 8/24/2016 | 8/24/2016 | 8/24/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/9/2016 | 8/9/2016 | 8/9/2016 | | PASS |
Andy J. Long
|
|
|
Vertical construction in progress. No trackout, no spills or discharges comeing from site. Clean & organized staging area. No corrections, see also ESC15-01184
|
General Inspection | 7/20/2016 | 7/20/2016 | 7/20/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 7/5/2016 | 7/5/2016 | 7/7/2016 | | PASS |
Andy J. Long
|
|
|
|