Site Final | 1/8/2018 | 1/8/2018 | 1/8/2018 | P | PASS |
Andy J. Long
|
|
|
Work complete. No dirt or other material leaving site. Site prepped for SFH construction, asphalt driveway has already been installed. Demo permit and bond finaled.
|
Aging Inspection | 1/8/2018 | 1/8/2018 | 1/8/2018 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 11/6/2017 | 11/6/2017 | 11/6/2017 | | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 9/4/2017 | 9/4/2017 | 9/5/2017 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 7/3/2017 | 7/3/2017 | 7/3/2017 | | CANC |
Melissa Jannusch
|
|
|
|
Aging Inspection | 5/1/2017 | 5/1/2017 | 5/1/2017 | | PEND |
Andy J. Long
|
|
|
demoliton of SFH complete, but disturbed area and stockpiles are not stabilized. No new SFH permits received yet. No trackout or muddy runoff from site. Tractor still parked on lot.
|
Aging Inspection | 2/27/2017 | 2/27/2017 | 2/27/2017 | | PASS |
Melissa Jannusch
|
|
|
Demo complete but soil not stabilized
|
Site Final | 2/27/2017 | 2/27/2017 | 2/27/2017 | P | NR |
Melissa Jannusch
|
|
|
Demo complete but soil not stablized
|
Aging Inspection | 12/27/2016 | 12/27/2016 | 12/28/2016 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 10/25/2016 | 10/25/2016 | 10/25/2016 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 8/23/2016 | 8/23/2016 | 8/23/2016 | | PEND |
Evan Jenkins
|
|
|
complete re-veg of remaining disturbed areas. No other ESC issues observed
|
Aging Inspection | 6/23/2016 | 6/23/2016 | 6/23/2016 | | PASS |
Evan Jenkins
|
|
|
|