Site Final | 6/1/2016 | 6/1/2016 | 6/1/2016 | P | PASS |
Andy J. Long
|
|
|
John Phone #: ###-####
Temp BMP drop inlet filter bag removed. New parking lot, sidewalks and gutters have been swept post construction. Final landscaping in progress. ESC permit conditions satisfied, approved for Final.
|
General Inspection | 4/8/2016 | 4/8/2016 | 4/8/2016 | P | PASS |
Andy J. Long
|
|
|
WIP. Silt fence installed to protect ditch on north side or property. Permit sign posted on porch. No trackout or other issues observed. Approved
|